Biomass Power Plant Maintenance and Overhaul – Austria
FACILITY
BIOMASS POWER PLANT
SCOPE OF WORK
INDUSTRIAL MAINTENANCE
TEAM
16 SPECIALISTS
VIEW PROJECT
Austria | The PRO-WELDING INDUSTRY SERVICES team carried out comprehensive maintenance, welding and installation works at a biomass power plant.
The project included the overhaul of biomass handling and boiler feeding systems, refurbishment of feed chutes, replacement of mechanical components in industrial equipment, and the installation of a new pressure vessel with modifications to the associated piping.
| Project Details | Information |
|---|---|
| Location | Austria |
| Facility | Biomass power plant |
| Team | 16 specialists |
| Project Duration | 3 weeks |
| Welding Methods | MMA 111, TIG 141 |
| Quality Control | VT, PT and pressure testing |
Overhaul of Biomass Boiler Feed Chutes
The works involved dismantling, refurbishing and reinstalling components of three biomass feed chute lines supplying fuel to the boiler.
The scope of work included:
- replacement and refurbishment of worn feed chute components,
- welding of wear-resistant HARDOX steel plates and thick-walled carbon steel components,
- replacement of fabric expansion joints.
The works were carried out at a height of 12 metres, within the confined space of an existing steel structure, using specialised lifting and handling equipment.
Welded joints were completed using the MMA 111 process and subsequently subjected to visual testing (VT) and penetrant testing (PT). The completed works received a positive assessment from an external technical inspection body.
Complete Overhaul of a Drag Chain Conveyor
One of the project’s main challenges was the dismantling and overhaul of a biomass conveyor measuring 40 metres in length and weighing 13 tonnes.
The operation required the preparation of supporting structures, removal of drive components and coordinated lifting operations involving two cranes with lifting capacities of 70 and 90 tonnes.
The overhaul included:
- dismantling and cleaning of conveyor components,
- replacement of the chain, scraper flights and sliding wear strips,
- installation of new guides, bearings and the drive sprocket,
- reinstallation of the conveyor in its operating position.
Dismantling and Reinstallation of a Screw Conveyor and Magnetic Separator
The PRO-WELDING team also carried out the dismantling and removal of a biomass screw conveyor and a belt-type magnetic separator, used to remove metallic contaminants from the biomass feed.
Following refurbishment, both units were successfully reinstalled in their original operating positions.
Pressure Vessel Replacement and Piping Modifications
The final scope of work involved replacing a process reactor pressure vessel and modifying the associated carbon steel and stainless steel piping connections.
A total of 38 welds were completed using the TIG 141 process on pipes with diameters of 48.3 mm and 88.9 mm. The integrity of the installation was confirmed by a successful pressure test.
Comprehensive Maintenance of Power Generation and Industrial Installations
This project demonstrates PRO-WELDING’s capabilities in combining specialised industrial welding, mechanical maintenance and the installation of large-scale industrial equipment.
Planning a maintenance shutdown, plant modernisation or industrial equipment overhaul? Contact PRO-WELDING to discuss your project requirements and available solutions.
Project Gallery:
PRO-Welding Industry Services provides installation, welding and maintenance services for industrial boilers, piping systems, pressure parts and process equipment.
We provide experienced teams of welders, fitters and supervisors for complex industrial projects and planned or emergency shutdown work across Europe and beyond.
OFFICE HOURS
- Mon.–Fri.: 8:00–16:00
- office@pro-welding.eu
URGENT TEAM MOBILIZATION
In case of urgent demand for a welding team, please contact us by phone:
+48 666 664 469, +48 666 663 916.